Spring Grove Dam (Rosetta, South-Africa)
Scope of Work
- All services discussed were performed on these Items:
- 3CR12 1800NB Outlet Pipe Work
- Emergency Gate
- Screens
- Guides
- Grapples
- Hydraulic Power Pack for Sleeve Valves
- 1800NB Butterfly Valves
- 1200NB Sleeve Valves
- 8 Ton Crawl Beams for Butterfly Valve Removal
- 800kg Man riding Hoist for Vertical Pipe Stack Inspections
- 6.3 Ton E.O.T Crane
- 25 Ton E.O.T. Crane
-
-
Services
Designs & Documentation
- Drawings
- Design Reports
- QCP Compliations
- Method Statements for Installations
- Program (Manufacture & Installation)
- Operation & Maintenance Manual
- Manufacturing Reports
- Cost Projections
Manufacture & Corrosion Protection
- Quality Control
- Component Priority Lists
- Inspections
- Data Book Compilations
- Transport to Site Logistics
Installation
Material handling & Control on site laydown area
Safety Files
Survey Reports
QCPS's for site weld & Corrosion Repairs
Coded Welders
Certified lifting Equipment
Welding Procedures
Certified Quality Control Instruments
Site Blasting & Corrosion Repair Equipment
Final Data Pack
Commissioning
- Wet & Dry Commissioning
- Equipment Demonstration
- End-user Training
- Liability Period inspection & maintenance
- Operation of the Completed Works as per client request
-
Interesting Facts
- Supply approximately 5 million people with water
- Roller compacted concrete dam with an 300m earth filled embankment
- 3 Gauing weirs
- 350m Wall
- 70m Spillway
- Artificial fish barrier
- Supply water in drought to Midmar Dam via transfer
- Approximately 33m deep