Neckartal Dam (Keetmashoop, Namibia, Africa)
Project Data
| Our Role |
Main Hydro Mechanical Subcontractor for Salini Impregilo |
| Project Date |
June 2014 - Current |
| Contractor |
Salini Impregilo |
| Consultant |
Knight Piesold |
| Performance Securities(Guarantees) |
✔ |
Scope of Work
- All services discussed were performed on these Items:
- 3000NB & 1600NB Outlet Pipe Work
- Valves
- Various Maintenance Gates
- Screens
- Guides
- Grapples
- Hydraulic Power Pack for Sleeve Valves
Services
Designs & Documentation
- Drawings
- Design Reports
- QCP Compliations
- Method Statements for Installations
- Program (Manufacture & Installation)
- Operation & Maintenance Manual
- Manufacturing Reports
- Cost Projections
Manufacture & Corrosion Protection
- Quality Control
- Component Priority Lists
- Inspections
- Data Book Compilations
- Transport to Site Logistics
Installation (In Progress)
Material handling & Control on site laydown area
Safety Files
Survey Reports
QCPS's for Site Weld & Corrosion Repairs
Coded Welders
Certified Lifting Equipment
Welding Procedures
Certified Quality Control Instruments
Site Blasting & Corrosion Repair Equipment
Final Data Pack
Commissioning (Planned for end 2017)
- Wet & Dry Commissioning
- Equipment Demonstration
- End-user Training
- Liability Period inspection & Maintenance
- Operation of the Completed Works as per Client Request
-
Interesting Facts
- 5,000 ha Irrigation Scheme
- Catchment Area of 45 365 km²
- Storage volume is expected to be 856 Mm³
- Full Supply Area may cover 39 km²
- 3.5km Total Pipe work ranging from 50NB to 3000NB
- 50mm to 3m Butterfly Valves
- Maintenance Gates ranging from 3.2m x 1.8m up to 5m x 5.3m
- Maintenance Gates 5m x 5.3m Total load on Gate 13,400kN with a Weight of 13.4 Tons
- Culvert Closure Gates which is closing 2 Diversion Tunnels of 4.7m x 4.3m
- On completion it will be the largest water storage dam in the country